Fall Work Day- October 10th!

By September 22, 2015Uncategorized

fallworkday2

See below for a list of projects:

1. Turn off water to shower houses- winterize
2. Lay flooring in Cabin #2
3. Install new CWS sign at entrance
4. Cabins, #1 and #2 – insulation, weather stripping, sealing cracks, etc
5. Finish repairs on shelters- steps that need to be replaced
6. Remove tarps from shelters
7. Trim tree branches
8. Cut trees and split firewood – we can always use more
9. Clean and repair gutter and soffit – NW of dining hall kitchen- has been temporarily fixed, but needs more work
10. Caulk roofing at NW dining hall
11. Fix basement leak in dining hall basement
12. Power wash all metal roofs
13. Repair or discard trailers at shop
14. Install metal roofs – north side – small shelter & pavilion
15. Install metal roof on the shop
16. Re-create labyrinth
17. Accessibility project- dining hall- exterior doors, grab bars in restrooms; concrete parking pad and front walk